Its construction area is 30km in length and designed with bottom width of 315m and water depth -19.5m, and the dredging work quantity is 33,000,000m3.
SENEGAL | DAKAR:09.05 18:21
NIGERIA | LAGOS:09.05 19:21
EGYPT | CAIRO:09.05 20:21
UAE | DUBAI:09.05 22:21
SRI LANKA | COLOMBO:09.05 23:51
SINGAPORE:09.06 02:21
ENGLAND | LONDON:09.05 19:21
RUSSIA | MOSCOW:09.05 22:21
CHINA | BEIJING:09.06 02:21
AMERICA | Los Angels:09.05 11:21
AMERICA | New York:09.05 14:21
BRAZIL | San Paulo:09.05 15:21