The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.
SENEGAL | DAKAR:09.05 20:32
NIGERIA | LAGOS:09.05 21:32
EGYPT | CAIRO:09.05 22:32
UAE | DUBAI:09.06 00:32
SRI LANKA | COLOMBO:09.06 02:02
SINGAPORE:09.06 04:32
ENGLAND | LONDON:09.05 21:32
RUSSIA | MOSCOW:09.06 00:32
CHINA | BEIJING:09.06 04:32
AMERICA | Los Angels:09.05 13:32
AMERICA | New York:09.05 16:32
BRAZIL | San Paulo:09.05 17:32